Hot cells & hot spots
Cracked, shaded or defective cells running hotter than their neighbors, which can damage the module over time.
Find hot cells, failed bypass diodes and dead strings across an entire array in one flight. Every fault is mapped to its panel and reported to IEC 62446-3.
What we find
Cracked, shaded or defective cells running hotter than their neighbors, which can damage the module over time.
A whole substring of a module heating up, a telltale pattern that shows a third of the panel isn't contributing.
Entire strings or modules that are disconnected or not producing, often from a blown fuse, tripped breaker or failed connector.
Overheating connections that waste energy and can become a fire risk if left alone.
Patchwork heating across modules that can point to potential-induced degradation (PID) or other systemic issues.
Broken glass, debris, vegetation shading and heavy soiling, captured in visual imagery alongside the thermal.
Flown to the standard
IEC 62446-3 is the international standard for infrared inspection of PV plants. It sets the conditions a thermal survey must be flown in and how findings are classified, so the results mean the same thing to your O&M team, your EPC, your insurer and the module manufacturer.
A survey that doesn't follow it is easy for a manufacturer to dismiss when you file a warranty claim.
Compared
| Drone thermography | Handheld IR walk | I-V curve tracing | |
|---|---|---|---|
| Coverage | Every module, in one flight window | Every module, row by row on foot | One string at a time |
| Finds faults at | Cell, module and string level | Cell, module and string level | String level |
| Electrical access | None — array stays online | None | Required at combiners |
| What you get | Georeferenced fault map and fault list | Individual images and notes | Electrical performance curves |
A drone survey tells your technicians exactly where to look; I-V tracing and on-site checks then confirm the electrical cause.
The deliverable
When to inspect
Confirm the system was delivered fault-free before you accept it.
Catch underperformance early and track the array year over year.
Standard-compliant evidence before the warranty window closes.
Document hail or wind damage quickly for repairs and insurance.
Know the real condition of an asset before you buy it.
Faults only show up thermally when the array is producing power under strong sun. That's the opposite of our roof scans, which are flown after sunset.
No. The system needs to be online and operating normally for the inspection to work.
15-30MW or 75-150 acres per flight day (season dependent). Larger farms are scheduled across consecutive clear days.
We coordinate access, safety briefings and any site-specific requirements with your team before flight day.
Tell us the site, system size and what you need the inspection for, and we'll come back with a quote and flight window.