Aerial PV thermography IEC 62446-3

Solar panel & solar farm inspection

Find hot cells, failed bypass diodes and dead strings across an entire array in one flight. Every fault is mapped to its panel and reported to IEC 62446-3.

F-1 F-2 F-3 TIR · ARRAY UNDER LOAD BLOCK A · ROWS 1–3 NORMAL HOT F-1 HOT CELL · F-2 DIODE F-3 STRING OFFLINE
Illustrative thermal view.
Systems
Commercial rooftop, ground-mount, utility-scale
When we fly
Clear midday sun, array producing
Minimum irradiance
600 W/m² in the module plane
Turnaround
24-48 hours

What we find

The faults that quietly cut production, and some that are a safety issue

Hot cells & hot spots

Cracked, shaded or defective cells running hotter than their neighbors, which can damage the module over time.

Bypass diode failures

A whole substring of a module heating up, a telltale pattern that shows a third of the panel isn't contributing.

Offline strings & modules

Entire strings or modules that are disconnected or not producing, often from a blown fuse, tripped breaker or failed connector.

Connector & junction box heating

Overheating connections that waste energy and can become a fire risk if left alone.

Degradation patterns

Patchwork heating across modules that can point to potential-induced degradation (PID) or other systemic issues.

Physical damage & soiling

Broken glass, debris, vegetation shading and heavy soiling, captured in visual imagery alongside the thermal.

Flown to the standard

Why IEC 62446-3 matters to you

IEC 62446-3 is the international standard for infrared inspection of PV plants. It sets the conditions a thermal survey must be flown in and how findings are classified, so the results mean the same thing to your O&M team, your EPC, your insurer and the module manufacturer.

A survey that doesn't follow it is easy for a manufacturer to dismiss when you file a warranty claim.

Checked and logged on every flight
  • Irradiance of at least 600 W/m² in the plane of the array, and stable through the survey
  • Cloud cover, wind and ambient temperature within limits
  • Thermal resolution and viewing angle sufficient to resolve individual cells
  • Each finding classified by the standard's Class of Abnormality

Compared

How aerial thermography compares

Drone thermography Handheld IR walk I-V curve tracing
Coverage Every module, in one flight window Every module, row by row on foot One string at a time
Finds faults at Cell, module and string level Cell, module and string level String level
Electrical access None — array stays online None Required at combiners
What you get Georeferenced fault map and fault list Individual images and notes Electrical performance curves

A drone survey tells your technicians exactly where to look; I-V tracing and on-site checks then confirm the electrical cause.

The deliverable

A fault list your crew can work straight from

  • Site fault map
    Every finding plotted on an orthomosaic of the array, by block, row and module.
  • Fault table
    Fault type, location, temperature difference and IEC 62446-3 Class of Abnormality for each item.
  • Thermal + visual pair per fault
    So technicians and manufacturers can see exactly what was found.
  • Conditions log
    Irradiance, ambient temperature, wind and time of survey, recorded for the file.

When to inspect

Built around the solar asset lifecycle

Commissioning

Confirm the system was delivered fault-free before you accept it.

Annual O&M

Catch underperformance early and track the array year over year.

Warranty claims

Standard-compliant evidence before the warranty window closes.

After storms

Document hail or wind damage quickly for repairs and insurance.

Acquisition

Know the real condition of an asset before you buy it.

Solar FAQ

Questions from asset owners

All FAQs

Why fly in the middle of the day?

Faults only show up thermally when the array is producing power under strong sun. That's the opposite of our roof scans, which are flown after sunset.

Do we need to shut anything down?

No. The system needs to be online and operating normally for the inspection to work.

How large a site can you cover in a day?

15-30MW or 75-150 acres per flight day (season dependent). Larger farms are scheduled across consecutive clear days.

Do you need site access or badging?

We coordinate access, safety briefings and any site-specific requirements with your team before flight day.

Find the modules that aren't pulling their weight.

Tell us the site, system size and what you need the inspection for, and we'll come back with a quote and flight window.